Title: Award Design Contract - Authorize the City Manager to award a professional design services contract to 4Creeks Inc in the amount of $264,114 for the design of Modoc Basin and the Linwood Embankment, appropriate $50,800 from the 221 Storm Construction Fund and $35,100 from the 261 Waterways Fund, and authorize the City Manager to execute a Measure R Supplemental Agreement with the Tulare County Transportation Authority (TCTA).
Attachments: 1. CP0662 Modoc Exhibit.pdf, 2. 4CreeksOwnershipDisclosure.pdf, 3. 4Creeks Modoc Basin Proposal.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Agenda Item Wording:
title
Award Design Contract - Authorize the City Manager to award a professional design services contract to 4Creeks Inc in the amount of $264,114 for the design of Modoc Basin and the Linwood Embankment, appropriate $50,800 from the 221 Storm Construction Fund and $35,100 from the 261 Waterways Fund, and authorize the City Manager to execute a Measure R Supplemental Agreement with the Tulare County Transportation Authority (TCTA).
body

Prepared by:
Katherine Woodhull-Fuget, Associate Engineer, Katherine.Woodhull-Fuget@visalia.gov, (559) 713-4447; Eric Bons, Senior Civil Engineer, Eric.Bons@visalia.gov, (559) 713-4350; Chris Crawford, City Engineer, Chris.Crawford@visalia.gov, (559) 713-4331; Jason Huckleberry, Engineering & Building Director, Jason.Huckleberry@visalia.gov, (559) 713-4495

Department Recommendation: Staff recommends that Council authorize the City Manager to award a professional design services contract to 4Creeks Inc for the design of Modoc Basin and the Linwood Embankment in the amount of $264,114, appropriate $50,800 from the 221 Storm Construction Fund and $35,100 from the 261 Waterways Fund, and authorize the City Manager to execute a Measure R Supplemental Agreement with the Tulare County Transportation Authority (TCTA) to utilize funds from the Measure R Trailways Fund (132) towards this project.

Summary:
This project will regrade the existing Modoc Basin located on the north side of Riggin to accommodate the extension of Linwood Street to the north. Design will include deepening the basin east of the Linwood alignment, grading the Linwood embankment, filling in the basin west of Linwood, a landscaped recreational trail around the basin, and potentially a parking lot for trail users.

Background Discussion:
Modoc Basin, located on the north side of Riggin Ave between Demaree and Akers, was acquired from the Modoc Ditch Company (MDC) by the City of Visalia in 2016. The basin serves as both a stormwater retention...