File #: 22-0026    Version: 1
Type: Consent Item Status: Agenda Ready
File created: 1/14/2022 In control: Visalia City Council
On agenda: 2/7/2022 Final action:
Title: Authorize the City Manager to award the construction contract for RFB 21-22-04, Battery Backup System & Traffic Signal Preemption Project in the amount of $204,754 to Pelagic Engineering of Oxnard, CA (3010-72000/CP0226-999 & 3010-72000/CP9531-999).
Attachments: 1. Attachment 1 - Project Location Map, 2. Attachment 2 - Bid Summary, 3. Attachment 3 - Ownership Disclosure
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Agenda Item Wording:
title
Authorize the City Manager to award the construction contract for RFB 21-22-04, Battery Backup System & Traffic Signal Preemption Project in the amount of $204,754 to Pelagic Engineering of Oxnard, CA (3010-72000/CP0226-999 & 3010-72000/CP9531-999).
body

Deadline for Action: None

Submitting Department: Administration - CIP Engineering

Contact Name and Phone Number:
Casey Chu, Assistant Engineer, casey.chu@visalia.city, 713-4491
Diego Corvera, Civil Engineer, diego.corvera@visalia.city, 713-4209
Frank Senteno, City Engineer, frank.senteno@visalia.city, 713-4331
Nick Mascia, Assistant City Manager, nick.mascia@visalia.city, 713-4323

Department Recommendation:
Staff recommends that City Council authorize the City Manager to award and enter into a contract with the lowest responsive bidder, Pelagic Engineering, in the amount of $204,754 for the construction of RFB 21-22-04, Battery Backup System & Traffic Signal Preemption Project.

Summary:
RFB 21-22-04, Battery Backup System & Traffic Signal Preemption Project contains two separate projects and are the continuation of existing projects to retrofit all of the City's traffic signals with both a battery backup system and an emergency vehicle preemption device. These two projects are bundled together for cost efficiency due to the similar nature of work and overlapping project locations.

The scope of the Battery Backup System (BBS) project is to install a BBS at existing signalized intersections to provide temporary electrical power to the traffic signal during a power outage. The BBS will allow a traffic signal to operate until the power has been restored or for sufficient time to allow City staff to place stop signs at each affected signalized intersection in anticipation of a longer power outage.

The Traffic Signal Preemption Project will install emergency vehicle preemption (EVP) devices on existing signalized intersections. The EVP equipment at the traffic signals will al...

Click here for full text