Legislation Details

File #: 25-0856    Version: 1
Type: Consent Item Status: Agenda Ready
File created: 5/29/2026 In control: Visalia City Council
On agenda: 6/15/2026 Final action:
Title: Approve a contract for supply of cold mix asphalt material- Approve a contract with Porterville Asphalt and Martin Marietta Materials for the supply of cold mix asphalt. The contract with the low bidder, Porterville Asphalt, shall not exceed $623,000 annually, totaling $3,115,000 over the term of the contract. The contract with the second lowest bidder, Martin Marietta Materials, shall not exceed $200,000 annually, totaling $1,000,000 over the term of the contract. Both contracts include an option to renew annually for up to (4) additional one-year terms.
Attachments: 1. RFB 24-25-56 Supply Cold Mix Asphalt, 2. Poterville Asphalt - Cold Mix, 3. Martin Marietta Materials - Cold Mix, 4. Bid Summary 24-25-56 Cold Mix, 5. levine act - Martin Marietta, 6. levine act - Porterville asphalt, 7. Porterville Asphalt Contract - Cold Mix, 8. Martin Marietta Materials Contract - Cold Mix
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Agenda Item Wording:
title
Approve a contract for supply of cold mix asphalt material- Approve a contract with Porterville Asphalt and Martin Marietta Materials for the supply of cold mix asphalt. The contract with the low bidder, Porterville Asphalt, shall not exceed $623,000 annually, totaling $3,115,000 over the term of the contract. The contract with the second lowest bidder, Martin Marietta Materials, shall not exceed $200,000 annually, totaling $1,000,000 over the term of the contract. Both contracts include an option to renew annually for up to (4) additional one-year terms.
body

Agenda Date: 06/15/2026

Prepared by:
Danny Galindo, Public Works Manager, danny.galindo@visalia.gov , 713-4186
Nick Bartsch, Public Works Director, nick.bartsch@visalia.gov ,713-4052

Department Recommendation: Staff recommends that the City Council approve a contract with Porterville Asphalt and Martin Marietta Materials for the supply of cold mix asphalt. The contract with the low bidder, Porterville Asphalt, shall not exceed $623,000 annually, totaling $3,115,000 over the term of the contract. The contract with the second lowest bidder, Martin Marietta Materials, shall not exceed $200,000 annually, totaling $1,000,000 over the term of the contract. Both contracts include an option to renew annually for up to (4) additional one-year terms.

Summary:
Approval of the proposed contracts will allow the City to procure cold mix asphalt material on an as-needed basis for ongoing street maintenance operations, including pothole repair, overlays, and pavement rehabilitation projects. Staff recommends awarding contracts to both Porterville Asphalt and Martin Marietta Materials to ensure material availability and operational continuity. The City will utilize the lowest responsive bidder as the primary supplier and may procure material from the secondary supplier when material availability, plant outages, scheduling, or operational needs require.

Background Discussion:
Within t...