File #: 23-0334    Version: 1
Type: Consent Item Status: Agenda Ready
File created: 8/25/2023 In control: Visalia City Council
On agenda: 10/2/2023 Final action:
Title: Authorize the City Manager to award the construction contract to A-C Electric Company of Bakersfield, CA for the Traffic Signal Interconnect Project along Ben Maddox Way and Tulare in the amount of $1,447,432 and appropriate $1,876,000 from the Measure R Local Fund (131).
Attachments: 1. Project Location Map, 2. Bid Results, 3. Ownership Disclosure Document
Related files: HIST-16146
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

Agenda Item Wording:

title

Authorize the City Manager to award the construction contract to A-C Electric Company of Bakersfield, CA for the Traffic Signal Interconnect Project along Ben Maddox Way and Tulare in the amount of $1,447,432 and appropriate $1,876,000 from the Measure R Local Fund (131).

body

 

Deadline for Action:  None

 

Submitting Department: Administration - CIP Engineering

 

Contact Name and Phone Number:

Vikram Manke, Assistant Engineer, Vikram.Manke@visalia.city, (559) 713-4491

Dolores Verduzco, Financial Analyst, Dolores.Verduzco@visalia.city, (559) 713-4540

Frank Senteno, City Engineer, Frank.Senteno@visalia.city, (559) 713-4331

Nick Mascia, Assistant City Manager, Nick.Mascia@visalia.city, (559) 713-4323

 

Department Recommendation:

Staff recommends that City Council authorize the City Manager to award the construction contract to A-C Electric Company of Bakersfield, CA for the Traffic Signal Interconnect Project along Ben Maddox Way and Tulare in the amount of $1,447,432 and appropriate $1,876,000 from the Measure R Local Fund (131).

 

Summary:

This project is to provide traffic signal interconnect communication to existing traffic signals along sections of Ben Maddox Way, Tulare Ave, Noble Ave, and Lovers Lane.  A new fiber optic communication cable shall be installed, along with associated equipment, to establish communication with the Traffic Management Center (TMC). In addition, the new fiber cable will also expand the City’s Information Services communication network to the new Fire Station #56.

 

Background Discussion:

The City continues to expand its Intelligent Transportation System (ITS) network by establishing new connections to signalized intersections. Under that broad goal, this project will install new fiber optic cable between VECC and existing signalized intersections along the following street sections:

-                     Ben Maddox Way from Goshen Avenue to Tulare Avenue

-                     Tulare Avenue from Ben Maddox Way to Lovers Lane

-                     Noble Ave from Ben Maddox Way to Walmart driveway

 

Within each signalized intersection, new communication equipment will be installed and connected to the existing infrastructure. New equipment to be installed includes CCTVs, signal controllers, ethernet switches, fiber terminations panels, and other ancillary equipment that will enable communication with the TMC located in the Visalia Emergency Communication Center (VECC). The traffic signal interconnection communication will expand the City’s ITS network to connect seven additional signalized intersections.  Five of these traffic signals will be along Ben Maddox Way from Goshen Avenue to Tulare Avenue which average about 21,000 vehicles per day.  The connectivity between the seven traffic signals along this corridor and the TMC will allow for the modification of these traffic signals remotely from the TMC, allowing for better flow of traffic. Additionally, a new fiber optic cable shall also be installed between VECC and the new Fire Station #56 on Lovers Lane, which is currently under development, to provide communication network capabilities and emergency-vehicle traffic control.

 

Bidding Process:

Staff advertised RFB 22-23-64 for the Traffic Signal Interconnect Project from August 9, 2023 to September 7, 2023.  Two companies responded with the following bids:

 

Contractor

Location

Bid Amount

A-C Electric Company

Bakersfield, CA

$1,447,432.00

Power Design Electric

Kingsburg, CA

$1,697,715.79

 

City staff reviewed all the bids submitted and found each bidder submitted the required information.  A-C Electric Company’s bid proposal was determined to be the lowest responsive bid. As part of the review process, the references provided by A-C Electric Company have been verified.  The response from each reference was favorable and demonstrated that A-C Electric Company can perform the work for this project.

 

Fiscal Impact:

The Traffic Signal Interconnect Project (CP0460) is funded by Measure R Local Fund and the budget summary is shown below:

 

Project Funding:

 Measure R Local Fund (131)

 $150,000

 

Total Project Funding:

$150,000

Project Cost:

 Design Consultant Contract

 $109,630

 

Design Staff Time

$20,000

 

Construction Contract

$1,447,432

 

Contingency (Approx. 15% of construction cost)

$216,938

 

City Surveying (Estimated)  Utility Relocations (Estimated)

$22,000 $73,000

 

City Construction Management & Inspection (Estimated) Geo-Technical (Estimated)

$101,000 $36,000

 

Total Project Cost (Estimated):

$2,026,000

Summary:

 Project Funding:

 $150,000

 

Project Cost:

($2,026,000)

 

Funding Need:

  ($1,876,000)

 

A total of $1,876,000 is needed to fund the construction phase of the project. Staff recommends allocating funds from Measure R Local Fund.  The Fire Station project will reimburse Measure R Local Fund.

 

 

 

 

 

Any remaining funds, upon completion of the construction, will be returned to the appropriate fund from which they were allocated.

 

Alternatives: Not award the construction contract and re-advertise the project.

 

Prior Council Action:

November 16, 2020

City Council authorized the City Manager to award the professional design services contract to Kimley-Horn and Associates, Inc. for the design of the Traffic Signal Interconnect Project in the amount of $136,615.00 and appropriated $150,000 from Measure R Local Fund (131)  for the design phase.

 

 

Recommended Motion (and Alternative Motions if expected):

recommendation

Authorize the City Manager to award the construction contract to A-C Electric Company of Visalia, CA  for the Traffic Signal Interconnect Project along Ben Maddox Way and Tulare in the amount of $1,447,432 and appropriate $1,876,000 from the Measure R Local Fund (131) for the construction phase. 

end

 

Environmental Assessment Status:

CEQA Review Completed - Categorical Exemption, Section 15301.