File #: 21-0676    Version: 1
Type: Consent Item Status: Agenda Ready
File created: 12/20/2021 In control: Visalia City Council
On agenda: 1/18/2022 Final action:
Title: Authorize the City Manager to award the construction contract for FY 18-19 SB1 Street Rehabilitation - Walnut & Murray (RFB 21-22-11), to Don Berry Construction, Inc. of Kingsburg, CA in the amount of $2,668,774.30 (CIP 3010-72000/CP0289-999 & 2370-72000/CP0402-999 ).
Attachments: 1. Rehab Location Map, 2. Paradise Street Project Location Map, 3. Contractor Disclosure Form, 4. Bid Summary

 

Agenda Item Wording:

title

Authorize the City Manager to award the construction contract for FY 18-19 SB1 Street Rehabilitation - Walnut & Murray (RFB 21-22-11), to Don Berry Construction, Inc. of Kingsburg, CA in the amount of $2,668,774.30 (CIP 3010-72000/CP0289-999 & 2370-72000/CP0402-999 ).

body

 

Deadline for Action:  None

 

Submitting Department: Administration - CIP Engineering

 

Contact Name and Phone Number:

Chantha Chap, Civil Engineer, chantha.chap@visalia.city, 713-4418

Casey Chu, Assistant Engineer, casey.chu@visalia.city, 713-4491

Frank Senteno, City Engineer, frank.senteno@visalia.city, 713-4331

Nick Mascia, Assistant City Manager, nick.mascia@visalia.city, 713-4323

 

Department Recommendation:

Staff recommends that City Council authorize the City Manager to award the construction contract for FY 18-19 SB1 Street Rehabilitation - Walnut & Murray (RFB 21-22-11), to Don Berry Construction, Inc. in the amount of $2,668,774.30.

 

Summary:

The FY 18-19 SB1 Street Rehab Project consists of two separate projects bundled together to obtain cost savings via economies of scale.

 

Those projects are as follows:

 

Project 1 (SB1 - CP0289): This project consists of paving Walnut Avenue from Central to Court (1.12 mi) and Murray Ave from Dudley to Encina (0.62 mi).  The rehabilitation work on Walnut Avenue includes removing isolated areas of pavement failures, also known as digouts, edge grinding of existing asphalt, and overlaying with asphalt and a paving mat.  The rehabilitation work on Murray Avenue consists of grinding off the existing asphalt, proof rolling the aggregate base, and overlaying with asphalt to include a paving mat.  The paving mat is made of recycled materials and is designed to maximize the life of the new pavement section.  Additionally, the project will upgrade some of the existing curb ramps to meet current Americans with Disabilities Act (ADA) requirements on both street segments.

 

Project 2 (Gas Tax - CP0402): This project, the Paradise Street Project, will resolve the subsidence in front of the residence on 3427 E Paradise Avenue.  Preliminary subsurface exploration has revealed debris and uncompacted fill underneath the roadway at this location resulting in the settling of the area.  The work to be performed includes excavation and disposal of the poor quality soil, compaction of new engineered fill, concrete improvements such as curb & gutter, sidewalk, and driveway, and repaving the disturbed work area.

 

Bidding Process:

A formal City bid process was conducted and on December 2, 2021, City staff opened eight (8) bids that were submitted for the project.  Per the construction contract documents, the apparent low bid was established by the lowest total of the Base Bid plus Alternate Bid 1 plus Alternate Bid 2.  The results are summarized below, listed in order from lowest to highest bid.

 

No.                      Contractor                                                               Location                                          Base Bid + Alt Bid 1 + Alt Bid 2

1.                     Don Berry Construction                     Kingsburg, CA                                          $2,668,774.30

2.                      AJ Excavation                                          Fresno, CA                                                               $2,999,730.00

3.                      Avison Construction                                          Madera, CA                                                               $3,011,417.00

4.                      Agee Construction                                          Clovis, CA                                                                $3,069,655.00

5.                      Emmetts Excavation                     Clovis, CA                                                               $3,179,070.00

6.                     Teichert Construction                     Fowler, CA                                                               $3,421,458.00                     

7.                      Cal Valley Construction                     Fresno, CA                                                               $3,521,027.00

8.                     Granite Construction                     Fresno, CA                                                               $3,576,513.35

 

Don Berry Construction submitted the lowest responsive Bid, and it is staff’s recommendation they be awarded the contract.  Staff reached out to the County of Madera, where Don Berry Construction is currently working on the County’s Pavement Rehab Project, and the County of Madera’s project manager indicated that Don Berry was easy to work with, had good communication to both staff and residents, minimal change orders, and performed quality work.  Additionally, our City Inspectors also noted that Don Berry Construction is a reputable contractor that performs quality work.

 

Background Discussion:

The City of Visalia currently maintains a street network of approximately 507 centerline miles of roadway and nearly 100 million square feet of pavement.  In an effort to appropriately direct maintenance activities and optimize the use of the limited maintenance funds available, Staff incorporated a Pavement Management Program (PMP) eight years ago, following the lead of other similarly sized California municipalities.

 

The projects that were constructed in the last eight years and those being awarded now will increase the City’s overall pavement condition index (PCI).  PCI is a numerical index between 0 to 100, with 0 indicating very poor pavement condition and 100 to indicate excellent pavement condition.  Higher PCI values represent better roads.  Roads with higher PCI have little to no visual stresses in the pavement such as cracks, rutting, or pot holes, and are generally smoother to drive on resulting in less wear and tear on vehicles.  Furthermore, higher PCI values, and thus better road conditions, make the road safer for the traveling public.

 

 

Fiscal Impact:

These projects are funded using SB1- Road Maintenance (Fund 113), Measure N (Fund 141), and  Gas Tax (Fund 111) funds.  Below is a summary of the estimated construction cost for both projects.

 

Budget Summary: FY 18-19 SB1 Street Rehab - Walnut & Murray, CP0289

 

Current Project Budget (SB1, Measure N, Gas Tax)                                                $2,708,000.00

SB1 Road Maintenance                                          $1,958,000.00

Measure N                                                                                       $705,000.00

Gas Tax                                                                                          $45,000.00

 

Estimated Project Costs:

Construction Cost                                                                                                                                                                               $2,545,729.30

Construction Contingency                                                                                                                                                                         $50,000.00

Construction Surveying                                                                                                                                                                           $7,000.00

Construction Inspection                                                                                                                                                                         $35,000.00

Construction Management                                                                                                                                                                         $30,000.00

Geotechnical Testing                                                                                                                                                                        $35,000.00

Total Project Costs                                                                                                                                                          $2,702,729.30

 

 

Budget Summary: Paradise Street Project, CP0402

 

Current Project Budget (Gas Tax)                                                                                                                               $185,000.00

 

Estimated Project Costs:

Construction Cost                                                                                                                                                                                             $123,045.00

Construction Contingency                                                                                                                                                                          $12,300.00

Construction Inspection                                                                                                                                                                            $6,200.00

Construction Management                                                                                                                                                                            $6,200.00

Geotechnical Testing                                                                                                                                                                            $4,000.00 

Total Project Costs                                                                                                                                                                        $151,745.00 

 

 

Since the current CIP project funds exceeds the project’s estimated costs no additional appropriations are needed at this time.

 

Prior Council Action:

None

 

Alternatives:

None Recommended

 

Recommended Motion (and Alternative Motions if expected):

recommendation

I move to authorize the City Manager to execute an agreement for RFB 21-22-11 in the amount of $2,668,774.30 for the FY 18-19 SB1 Street Rehabilitation - Walnut & Murray to Don Berry Construction, Inc.

end

 

CEQA Review:

None

 