Title: Award construction contract for pedestrian bridge- Authorize the City Manager to award the construction contract with Cen-Cal Construction for the Plaza Park pedestrian bridge project in the amount of $283,382.
Attachments: 1. Project Location Exhibit, 2. RFB 26-27-01 Draft Construction Contract, 3. Cen-Cal Construction Bid Proposal, 4. Cen-Cal Construction Ownership Disclosure
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Agenda Item Wording:
title
Award construction contract for pedestrian bridge- Authorize the City Manager to award the construction contract with Cen-Cal Construction for the Plaza Park pedestrian bridge project in the amount of $283,382.
body

Agenda Date: 10/19/2026

Prepared by:
Katherine Woodhull-Fuget, Associate Engineer, Katherine.Woodhull-Fuget@visalia.gov, (559) 713-4447
Eric Bons, Senior Civil Engineer, Eric.Bons@visalia.gov, (559) 713-4350
Chris Crawford, City Engineer, Chris.Crawford@visalia.gov, (559) 713-4331
Jason Huckleberry, Engineering & Building Director, Jason.Huckleberry@visalia.gov, (559) 713-4495

Department Recommendation: Staff recommends that the City Council authorize the City Manager to award a contract with Cen-Cal Construction for the Plaza Park pedestrian bridge Project in the amount of $283,382.

Summary:
The eastmost pedestrian bridge across Mill Creek in Plaza Park, previously located between the main children’s playground and the restrooms, was damaged by a falling oak tree in Spring of 2023 and was subsequently removed. This bridge provided the only ADA access to the park restrooms from the large playground and arbors on the south side of Mill Creek.

This project will install a new prefabricated pedestrian bridge to restore pedestrian access across Mill Creek in Plaza Park.

The Plaza Park pedestrian bridge project was advertised (RFB 26-27-01) and closed October 6, 2026, with eight (8) construction proposals received. Cen-Cal Construction was the low bidder in the amount of $283,382.

Background Discussion:
The pedestrian bridge project is located within Plaza Park, which is located off South Plaza Drive from Highway 198. This project will restore the eastmost pedestrian crossing of Mill Creek by installing a new prefabricated steel pedestrian bridge. The previous bridge was damaged by a falling oak tree in Spring of 2023 and removed as a safety hazard. Currently, there is no direct or accessible path from the playgro...